Cast Hatch Hinge Gap & Alignment Adjustment
Procedure Reference Figures
Items Needed to Complete This Job
- 9/16” open-end wrench or socket
- Flat head screwdriver or hardwood/polymer wedge
- Protective gloves
- 2-person job required (one topside, one below deck)
- Vickers Oils VICKERLUBE BIO WDF (penetrant if nuts are seized)
- CRC Ceramic Paste Anti-Seize (corrosion protection for studs)
Step-by-Step Procedure
Undog your hatch
Rotate handle mechanism to disengage all dog arms completely from the coaming wedge risers.
Loosen hinge nuts on underside of coaming
Use a 9/16” end wrench to loosen the hinge nut (located on bottom side of coaming). Only loosen sufficiently to permit lateral bracket movement; do not remove nuts entirely.
Close hatch, pry, and retighten (2-person action)
Close the hatch but do not dog down into the locked position.
Release side pressure and verify clearance
Once the hinge nuts are tight, you can release the side pressure on the hatch. Verify uniform clearance around the entire perimeter, then cycle handle to dog the hatch down. Operation should be smooth without binding.
Download Service Procedure as PDF
Official shipboard document (DOC BM-2400-H01) featuring Swedish and English instructions. Tailored for shipboard Planned Maintenance Systems (PMS) and deck surveys.





