Series 2400 Cast Hatch Weld-In or Bolt-On Installation Instructions

Installation manual for coamings mounted in deck, bulkhead, wall, or plate structures
OEM Document Control
ISO 755-02-01
Revision: 27-OCT-2003
Core Principle: Proper installation and maintenance will insure years of service. The FREEMAN hatch is designed to give low maintenance, watertight protection, and easy, quick-acting operation for ready access below deck. Proper installation will insure trouble-free operation of the FREEMAN hatch.

Installation Requirements: Flatness & Deck Camber

It is important to install the hatch ring correctly into the deck, bulkhead, wall, plate, or other location. The ring into which the hatch is placed must remain flat in all applications. If the ring sealing surface is not flat, the gasket will not form a good seal.

Deck Camber Caution: Deck camber or other deviation from a flat surface should always be taken into account and corrected when mounting the ring (e.g. via leveled coaming inserts).

Welding Specifications & Consumables

Refer to the following structural specifications for appropriate welding consumables and procedures:

Aluminum Ring (Alloy 356):
ANSI/AWS D1.2: Structural Welding Code – Aluminum. Appropriate alloy filler wire per base deck plate specification.
Steel Ring (Alloy A36):
ANSI/AWS D1.1: Structural Welding Code – Steel. Standard structural marine carbon steel consumables.
Stainless Steel Ring (304 or 316):
MIL-STD-1689: Fabrication, Welding and Inspection of Ships Structures (or AWS D1.6). Grade 316L filler wire.

Welding: Sequence Tack Welding & Full Perimeter Welds

In a welding application, take special care to cut the hole as close to the ring size as possible. Heat build-up caused by weld-filling an excessive gap can cause the ring to distort. The proper welding sequence prevents coaming warp:

Welding sequence for hatch coaming ISO 755-02-01 Freeman Marine
[Figure: Welding Sequence Diagram ISO 755-02-01 – Tack welding with 6" spacing]
Welding Sequence Diagram: Underside tack welding in alternating sequence (#1, #2 opposite, #3 opposite, etc.) with 6" spacing.

Step-by-Step Welding Sequence:

  1. Assure clean joint fit-up with minimum joint gap.
  2. From below deck: Uniformly tack the ring to the deck with 1” welds (~25 mm) according to the sequence below:
    • Complete one 1” tack weld at position #1.
    • Tack weld at position #2 – as far as possible to the opposite side of the coaming.
    • Tack weld at position #3 – as far as possible from the last tack weld.
    • Continue tack welding, being sure that each one is as far as possible from the last.
  3. Tack welding is complete when the welds are 6” apart (~150 mm) along the entire perimeter of the coaming. This alternate spacing is critical to prevent overheating and distortion of the coaming!
  4. From topside: When tack welding is complete and cool, fully weld the perimeter of the coaming.
CAUTION: Do not overheat the hinge pocket! When welding a hinged ring into place, exercise extreme care. Due to the proximity of the hinge bushings to the outer edge of the hinge pocket, overheating can cause meltdown of the bushings and loss of watertight integrity!

Bolting: Flange Bedding Compound & Galvanic Isolators

For bolt-in installation, the aluminum ring comes equipped with a precision mounting flange:

1. Bedding Compound:

A neoprene gasket of approximately 50 durometer or a quality marine bedding compound (Sikaflex 591 STP) is recommended between the flange and the deck. Apply a solid continuous bead around the flange and surround each fastener hole.

2. Galvanic Isolators:

Isolators (shoulder washers / sleeves) should be installed between the stainless steel bolts and the aluminum deck ring/coaming. Coat all fastener threads with CRC Ceramic Paste to prevent galling and dielectric corrosion.

Inside Escape Handle & Dog Tension Adjustment

Inside Escape Handle Installation:

If an inside escape handle is included, slide the handle onto the shaft with handle facing away from the mechanism. Align the cross hole in the shaft to the hole in the handle. Drive the supplied stainless steel knurled pin into the hole, SMOOTH END FIRST.
BE CERTAIN TO SUPPORT THE CENTER SHAFT SOLIDLY WHILE DRIVING THE PIN!

Mechanical Tension Adjustment:

The FREEMAN hatch is designed to open and close with uniform tension each time. Adjustment of this tension is best completed with the cover plate in place in the ring and mechanism in closed position. THIS ADJUSTMENT IS IMPORTANT AS IT INSURES PROPER GASKET SEAL!

  • Each locking arm is slotted and slides over a threaded stud with a nylon washer, stainless steel washer, and nylon insert locknut.
  • Tighten or loosen the locknut as needed so that tension on each arm is the same. Do this to each arm.
  • The hatch handle should turn with relative ease, yet all locking arms should be rigid when the hatch is closed.
  • Perform adjustment when first installed and periodically as required to keep the hatch sealing properly.
Print-Ready PDF • A4 Double-Sided

Download Installation Manual as PDF

Official shipyard document (DOC BM-2400-I01) with Swedish and English instructions. Includes stitch-welding diagram and bolt-in specifications for shipwrights and fitters.

© Bövik Marin AB • Authorized Distributor for Freeman Marine Equipment
Document BM-2400-I01
Back to top