2400 Series Cast Hatch Routine Maintenance & Lubrication
Items Needed to Complete This Job
- Clean shop towel / lint-free cloth
- Small brush for precise grease application
- Protective gloves (nitrile)
- Vickers Oils BIOGREASE EP2 (substitutes Mystik JT-6 No. 2)
- Vickers Oils VICKERLUBE BIO WDF (penetrating bio-spray)
- CRC Heavy-Duty Marine Cleaning Wipes (50 pcs)
- CRC Silicone Stick for Gaskets (50 ml)
Step-by-Step Maintenance Procedure
Operate integral T-Handle
Lift and operate the integral T-HANDLE to ensure the mechanism is cycling smoothly and functioning properly without mechanical binding.
Lubricate T-Handle shaft diameter
While in the pulled-up (raised) position, lightly lubricate the T-HANDLE shaft around its diameter near the lower end where it contacts the CENTER BUSHING using Vickers Oils BIOGREASE EP2.
Distribute grease to center bushing O-Ring
Lower the T-HANDLE and operate through a few full cycles. This rotational action distributes the shaft grease across the bushing’s internal O-RING, ensuring water exclusion along the drive spindle.
Wipe excess grease from grip
Wipe any excess grease off the upper end of the T-HANDLE shaft where the operator's hand may contact to maintain clean and slip-free deck operation.
Comprehensive mechanism & contact point lubrication
Apply a light, protective film of Vickers Oils BIOGREASE EP2 to the following critical components (lightly coat As Required):
- Actuator pivot sockets: Ball pivots and linkage drive sockets.
- Ramps: Wedge tracks including integral Acetron bumpers.
- Handle U-Channel: Internal sliding guides of the mechanism channel.
- Slotted end of dog arms: Contact surfaces underneath the nylon washer on each standoff.
- Coaming flange: Contact lands where each dog arm clamps against the coaming under tension.
Scheduled Shipboard Maintenance Intervals
Visual inspection of dogs and seals. Complete lubrication of T-handle shaft, O-ring, and linkage points per steps 1–5. Verify coaming drain scuppers are clear.
Strip old grease residues and salt scale using penetrating bio-fluid. Repack pivot points with fresh EP2 grease and conduct standard chalk testing to verify uniform gasket compression.
Download Maintenance Procedure as PDF
Official shipboard document (DOC #2400-P01) with English on side 1 and Swedish on reverse. Tailored for shipboard Planned Maintenance Systems (PMS) and engine room logs.





